|
SUMAC The Stanford-USGS SHRIMP RG was built by Australian Scientific Instruments following the design of the prototype instrument for ANU. Our SHRIMP was dismantled in Canberra starting March 16, 1998 and delivered on April 10, 1998 to the ion microprobe lab at the Green building in Stanford. Ten hours after delivery, the main components were in place and three days later the vacuum pumps were ready to be turned on. Within two weeks of delivery, an ion beam was focused into the collector. The ion microprobe lab is a custom built facility in the basement of the Green Building, Stanford University.
PHOTO GALLERY OF INSTALLATION Click on an image to get an enlargement or try the moie for the real action (5.3 MB QuickTime movie)
At a small function at Stanford University, Dean Lynn Orr presided over the opening of the SHRIMP lab. After the laying-on of the Stanford bar-code (pictured), officially signifying the arrival, those gathered celebrated the occasion with the consumption of ....shrimp, of course.
©
Stanford University. 450 Serra Mall, Stanford, California 94305. (650)
723-2300. Terms of
Use | Copyright
Complaints
U.S. Department of the Interior, U.S. Geological Survey, Menlo Park, California, USA | USGS Privacy Statement | USGS Disclaimer | URL http://shrimprg.stanford.edu Contact: SHRIMPWEBTEAM Last modification: March 4, 2013 |